BDO Unibank Inc. has extended ₱24.75 billion in credit to support First Gen Corp.’s entry into a massive hydropower venture, but the deal comes with a “key man” leash that effectively holds the financing hostage to the continued leadership of Federico R. Lopez.
The standby letters of credit backs First Gen’s ₱61.875 billion acquisition of a 33% stake in Prime Hydropower Energy Inc. (PHEI), a unit controlled by ultra bilyonaryo Enrique K. Razon Jr.’s Prime Infrastructure Capital Inc.
While the deal gives First Gen a slice of a 2,000-megawatt pumped-storage portfolio, it also formalizes a rigid corporate succession structure via its financing terms.
Under the financing covenants, BDO has designated a “change of management control” as an event of default. This trigger is tied specifically to Federico R. Lopez (FRL).
Should Lopez cease to be chief executive of First Gen, or if his hand-picked “designees” fail to maintain a majority on the board, BDO can theoretically pull the plug on the credit facility.
The terms go as far as requiring that any leadership successor be “confirmed in writing by FRL” as acceptable to the bank. This ensures that the strategic direction of the Wawa and Pakil hydro projects remains under a Lopez-controlled orbit.
